Connect with us

Nigeria News

Third Mainland Bridge To Be Shut Down This Weekend

Published

on

at

FG Closes Third Mainland Bridge Friday (See Alternative Routes)

President Muhammadu Buhari-led government on Thursday announced the completion of the first phase rehabilitation of the Third Mainland Bridge.

The government also noted that there would be 18-hour total closure of the bridge this weekend.

Mr Olukayode Popoola, the Federal Controller of Works in Lagos, during an inspection of the bridge disclosed that the fixing of six expansion joints on the Oworonshoki-bound carriageway had been completed.

He further stated that the closure of the bridge is important so that debris would be cleared from the section and construction would move to the Island-bound carriageway.

The 18-hour closure would begin from midnight on Saturday through Sunday. By midnight of Sunday, the total closure would be removed and the partial closure would return.

The diversions will still be at the same previous points.”

“Work is to commence on the Island-bound lane of the bridge with the partial closure of Adekunle to Adeniji Adele Phase B.”

“The repair work is to commence between 22nd of November, 2020 and 22nd of February, 2021 for a duration of three months,” he said



is an Associate at Naija News. He is a news media enthusiast, he holds a degree in psychology and loves exploring and sharing about the enormous power that lies in the human mind. Email: [email protected], Instagram: adeniyidman